100 % effectif against "ALL BIRDS"

INSTALL



IMG_4553

Preparing the surface for glueing the base (rod holders)

IMG_4554
IMG_4571


These bases you could glue with an MS Polymer glue, screw, or rivet them.
the bases are all prepared for that with 3 mm holes in the bottom of the bases

IMG_4574

Modèl L-3 glued with an transparant glue MS Polymer

IMG_4577

After installing the bases with glue (about 4 -12 hours later depending temperatur) you can start clicking the stainless steel 316L (SS) rods into the bases. They will be connected with the SS springs to each other with no limits. and without problems with shrink !


IMG_4683

SAFETY FIRST ! (It is an obligation installing Warning shields on places where people could touch the system)


IMG_4686



IMG_4695


IMG_4707

The SS springs connect the SS rods to each other with no limits. and without problems with shrink ! (push and turn right for an indestructible connection) (Pull and turn right will de-connect !)

IMG_4711

Extremely flexible, every 1 meter there is an spring.

IMG_4712

IMG_4720

Almost invisible !!



IMG_4723

Connecting the ZERO BIRDS rods to the pulsgenerator (energizer) we use a special high tension cable which is tested up to 18 KV we use normally never more than 5 Kv and no more than 1 Joule for birds in general. All Zero Birds cables wil be handmade prepared in our company so your install time is on location is the lowest from all systems (comparing other; spike an electro systems.)


IMG_4741


ZB-TW-T cable01 ZB-TW-T cable07


zb08


zb11

zb12